COMPLETE: Leo Electrical Power Shut Down - Friday, Aug 2nd, 1-5pm

UPDATE: The electrical shutdown in Leo was completed on Friday, August 2nd around 6pm.

There will be an electrical shutdown in Leo on Friday, August 2nd from 1pm-5pm.

This shutdown will impact Leo basement as well as the second and third floors. Both wired and wireless networks will be affected throughout all of Leo and the GPAC building for the duration of the electrical shutdown.

If you have any questions about the electrical shutdown, you can contact Physical Plant. If you have any questions about the wired or wireless networks in the building, you can contact ITS at extension x-7973 or via email at its@manhattan.edu. We apologize for any inconvenience.