Pages

Tuesday, July 23, 2019

COMPLETE: Leo Partial Electrical Shutdown 7/26 and 7/27

UPDATE3: As of 9:36pm on 7/27, all switches are online in Leo and GPAC buildings. Both wired and wireless throughout has been restored. 

UPDATE2: As of 8:00am, our primary data closet has been put on a temporary power circuit, and therefore restoring all of the wired and wireless networks throughout Leo and GPAC building. This closet will be switched back to the main power circuit at the conclusion of the renovations today (around 7pm). During this transition, both wired and wireless will go down briefly.

UPDATE: During this electrical shutdown, power was inadvertently turned off to the closet that services our main network equipment in the building. This shutdown has caused the both the wired and wireless networks for Leo and GPAC buildings to be down completely. ITS will update the community as soon as we hear of updates first thing in the morning. We apologize for any inconvenience that this may cause.

There will be a partial electrical shutdown in Leo on Friday, July 26th from 1pm-6pm and again on Saturday, July 27th from 7am-6pm.

This shutdown will impact the center core area of Leo on floors 2 and 3. Both wired and wireless networks will be affected on these floors during this electrical shutdown. This shutdown is required for construction activities.  

If you have any questions about the electrical shutdown, you can contact Physical Plant. If you have any questions about the wired or wireless networks in the building, you can contact ITS at extension x-7973 or via email at its@manhattan.edu. We apologize for any inconvenience.