Pages

Monday, January 29, 2024

COMPLETED: Upcoming Network Maintenance: 02/03 & 02/10 - 6:00AM to 10:00AM

Update 02/10: Maintenance for 02/10 has been completed successfully

_____________________________________________________________________________________

Update 02/03 8:16 AM: Maintenance for 02/03 has been completed successfully

_____________________________________________________________________________________

In order to improve network reliability and stability throughout campus, ITS will be conducting upgrades on network equipment on Saturday, February 3rd and 10th from 6:00 AM to 10:00 AM. These upgrades will cause local outages in certain areas on campus. This network maintenance will affect both wired and wireless networks.

The upgrade schedule is as follows:

Feb 3rd (02/03): Lee, Horan, Leo + GPAC, RLC, Kelly, Physical Plant, Higgins

Feb 10th (02/10): DLS, Memorial, Library, Miguel, Draddy, Jasper, Chyrsostom, Hayden + Broadway Garage, Thomas + Smith


Please note that during this time wired and wireless networks in these buildings will be temporarily unavailable. To minimize disruptions, each building will be taken down one at a time. The downtime for each building is expected to last between 20 minutes and 1 hour, depending on the extent of updates required for each specific building.


We apologize for any inconvenience this may cause. If you have any questions, please contact ITS at its@manhattan.edu or at extension x-7973