COMPLETE - Lee Hall/Horan Hall - Brief Network Outage - 6/16 at 11am

UPDATE: As of 6/16/2021, at 1135am, this scheduled generator test was complete.

_____________________________________________________________________________________________________

Physical Plant will be conducting a generator test in Lee Hall and Horan Hall on Wednesday, June 16, 2021. The generator test will commence in Lee Hall first at 11:00am, followed by Horan Hall at 11:30am.

There will be two brief outages, one while switching to generator power, the other while switching back to main power. Both wired and wireless will be affected during this generator test.

Only Lee and Horan Halls will be affected during this generator test. This will not affect the rest of campus.