UPDATE: The transformer replacement has been completed. Lee Hall did not lose power during the maintenance, and therefore did not lose network connectivity. Draddy Gym did lose power, however, all power is back online and all network services have been restored.
Con Edison is doing emergency transformer work on Friday, November 29th. This work will require a temporary shut down of Lee Hall, Draddy Gymnasium, and Alumni Hall. Both the wired and wireless in all three buildings will be down for the duration of this maintenance. This maintenance should not affect any other buildings on campus.
Public safety has been informed along with Residence Life and Facilities. Physical Plant will have personnel on campus to shadow the work and make sure that all systems are returned to normal. ITS will monitor the network throughout the duration of the maintenance period.
If you have any questions regarding this maintenance, please contact Physical Plant.